Clean Rooms
1 of 4

ASU Physical Science Renovation

8,500 sq. ft.
Architect: Dick & Fritsche Design Group
Complete demolition down to the concrete slab and floor deck in the basement of the Physical Science building on ASU?s main campus. Project includes wet and dry labs for the chemistry, physics and geology departments, a 1,500 s.f. metal free clean lab and a Class 1,000 clean room for the physics department. Project includes architectural finishes, a brand new acid underground waste system, Project includes a complete metal free construction. Consists of 15 PVC fume hoods, PVC base and upper cabinets with resin tops and integral sinks, custom PVC ulpa filters, plastic ceiling grid and tile, plastic sealed lights, PVC walls, PVC doors, PVC frames, PVC hardware, PVC interlocked pass thrus, LXT RO piping, PVC water and air piping with plastic valves, plastic outlet covers, vinyl heat seamed floor, plastic faucets and plastic eyewash stations. Project also includes a dedicated single pass clean room air handler system, coated exhaust fan with Corzan plastic ductwork, underground acid waste system and ultra pure water system, all for a 24/7 operation.